Check out the new USENIX Web site.

Home About USENIX Events Membership Publications Students
11th Systems Administration Conference (LISA '97)

Developing Interim Systems

Jennifer Caetta
Jet Propulsion Laboratory

Abstract

One of the recent challenges in the aerospace industry has been to smoothly transition operations-oriented computer systems to meet increasing demands on smaller budgets. Sometimes the best solution is not affordable, but the current situation is equally untenable. Change becomes necessary, but is only acceptable at minimal operational impact and financial costs.

Frequently, interim software solutions must be developed while new hardware is under design or production. These interim systems are characterized by an immediate need with a limited budget. This paper discusses several factors involved with producing a working software set in minimal time, such as the initial approach, budgetary concerns, and resource-scavenging. By recognizing the importance of these factors, interim system developers will be able to produce working systems with a minimum of setbacks.

  • View the full text of this paper in HTML form and PDF form.

  • If you need the latest Adobe Acrobat Reader, you can download it from Adobe's site.

  • To become a USENIX Member, please see our Membership Information.

?Need help? Use our Contacts page.

Last changed: 12 April 2002 aw
Technical Program
Conference Index
USENIX home