Gap Completion


The task of the gap completion phase is to improve the results of our analysis by filling the gaps between basic blocks in the control flow graph with instructions that are likely to be valid. A gap from basic block $b_1$ to basic block $b_2$ is the sequence of addresses that starts at the first address after the end of basic block $b_1$ and ends at the last address before the start of block $b_2$, given that there is no other basic block in the control flow graph that covers any of these addresses. In other words, a gap contains bytes that are not used by any instruction in the control flow graph.

Gaps are often the result of junk bytes that are inserted by the obfuscator. Because junk bytes are not reachable at run-time, the control flow graph does not cover such bytes. It is apparent that the attempt to disassemble gaps filled with junk bytes does not improve the results of the analysis. However, there are also gaps that do contain valid instructions. These gaps can be the result of an incomplete control flow graph, for example, stemming from a region of code that is only reachable through an indirect jump whose target cannot be determined statically. Another frequent cause for gaps that contain valid instructions are call instructions. Because the disassembler cannot continue after a call instruction, the following valid instructions are not immediately reachable. Some of these instructions might be included into the control flow graph because they are the target of other control transfer instructions. Those regions that are not reachable, however, cause gaps that must be analyzed in the gap completion phase.

The algorithm to identify the most probable instruction sequence in a gap from basic block $b_1$ to basic block $b_2$ works as follows. First, all possibly valid sequences in the gap are identified. A necessary condition for a valid instruction sequence is that its last instruction either (i) ends with the last byte of the gap or (ii) its last instruction is a non intra-procedural control transfer instruction. The first condition states that the last instruction of a valid sequence has to be directly adjacent to the first instruction of the second basic block $b_2$. This becomes evident when considering a valid instruction sequence in the gap that is executed at run-time. After the last instruction of the sequence is executed, the control flow has to continue at the first instruction of basic block $b_2$. The second condition states that a sequence does not need to end directly adjacent to block $b_2$ if the last instruction is a non intra-procedural control transfer. The restriction to non intra-procedural CTIs is necessary because all intra-procedural CTIs are included into the initial control flow graph. When an intra-procedural instruction appears in a gap, it must have been removed during the conflict resolution phase and should not be included again.

Figure 6: Gap completion and disassembler output.
\scalebox{0.55}{\includegraphics{gap}}


Instruction sequences are found by considering each byte between the start and the end of the gap as a potential start of a valid instruction sequence. Subsequent instructions are then decoded until the instruction sequence either meets or violates one of the necessary conditions defined above. When an instruction sequence meets a necessary condition, it is considered possibly valid and a sequence score is calculated for it. The sequence score is a measure of the likelihood that this instruction sequence appears in an executable. It is calculated as the sum of the instruction scores of all instructions in the sequence. The instruction score is similar to the sequence score and reflects the likelihood of an individual instruction. Instruction scores are always greater or equal than zero. Therefore, the score of a sequence cannot decrease when more instructions are added. We calculate instruction scores using statistical techniques and heuristics to identify improbable instructions.

The statistical techniques are based on instruction probabilities and digraphs. Our approach utilizes tables that denote both the likelihood of individual instructions appearing in a binary as well as the likelihood of two instructions occurring as a consecutive pair. The tables were built by disassembling a large set of common executables and tabulating counts for the occurrence of each individual instruction as well as counts for each occurrence of a pair of instructions. These counts were subsequently stored for later use during the disassembly of an obfuscated binary. It is important to note that only instruction opcodes are taken into account with this technique; operands are not considered. The basic score for a particular instruction is calculated as the sum of the probability of occurrence of this instruction and the probability of occurrence of this instruction followed by the next instruction in the sequence.

In addition to the statistical technique, a set of heuristics are used to identify improbable instructions. This analysis focuses on instruction arguments and observed notions of the validity of certain combinations of operations, registers, and accessing modes. Each heuristic is applied to an individual instruction and can modify the basic score calculated by the statistical technique. In our current implementation, the score of the corresponding instruction is set to zero whenever a rule matches. Examples of these rules include the following:


When all possible instruction sequences are determined, the one with the highest sequence score is selected as the valid instruction sequence between $b_1$ and $b_2$.

The instructions that make up the control flow graph of our example function and the intermediate gaps are shown in the left part of Figure 6. It can be seen that only a single instruction sequence is valid in the first gap, while there is none in the second gap. The right part of Figure 6 shows the output of our disassembler. All valid instructions of the example function have been correctly identified.